Process

OUR PROCESS

Our five-phase development process ensures the work we do on your project meets your expectations as well as regulatory requirements so your product can launch successfully as a commercial product. We work with you under your quality management system wherever you are in the process, whether you are starting at the very beginning of the development process or already have a detailed design for your product.

THE PALMER PRODUCT DEVELOPMENT PROCESS

Phase 1: Feasibility

  • Focused on capturing all requirements informing system design and planning how they will be tested
  • Requirements may come from user needs, marketing features, risk mitigations, regulatory standards, etc.
  • If necessary to reduce technical risk, work to demonstrate feasibility of a design and/or creation of Proof-of-Concept (POC) prototypes

Phase 2: Prototype Design

  • Focused on testing and characterizing any novel, un-proven, or otherwise high-risk design elements
  • Proof-of-concept prototypes can often be accomplished with off-the-shelf hardware (evaluation kits, development boards, etc.)
  • More complex designs may require custom PCBA design
  • Prototype design phase may encompass multiple design iterations (e.g. POC on development boards, alpha prototype, fit-form-function prototype) 

Phase 3: Detailed Design

  • Revise design based on information gathered in prototype testing
  • Build pilot units suitable for formal verification testing
  • Create supplementary design documentation as necessary (Design Description, Software Architecture, System Block Diagram, etc.)

Phase 4: Verification Testing

  • Focused on testing the device against released requirements
  • Performance failures discovered in this phase may require revisiting any of the previous phases
  • Test methods, protocols, and results are captured in format suitable for regulatory submission
  • This phase may also include PWM aiding/facilitating official testing done by registered 3rd-party labs (EMC, electrical safety testing, etc.)

Phase 5: Manufacturing Transfer

  • Coordination with CM/manufacturing group for release of final electrical build files, bills of materials, final software binaries, etc.
  • Assistance in manufacturing test procedure creation
  • Creation of manufacturing functional test stations